Holding Tank Discussion

Attached are the specs for the holding tank that fits perfectly into the old style boats. when I say perfectly – NOT much room left over. here are Specs holdingtankdesignv1-4

I got this from:

FRANCE-MAR plastics
Mr. Mark and (Gary) Gortan (owners)
2113, Unit G, St-Regis
Dollard Des Ormeaux, QC (this is Montreal)
H9B 2M9
Web: www.france-mar.com
e-mail: mgortan@france-mar.com
Tel: 514-684-2806

On Alberg 30 Site here

Leave a comment

Filed under Interior, Products, Tanks

Water Tank – Rehab

Just starting this process – drilled an inspection port in, and will try and get away with doing everything through the port for near term. These are shots with phone – shooting blind. Good thing was that there was nothing in the tank. I think that is good. Of course it may mean that it all leaked out.

Lynne is not impressed with this! She wants a complete forward end of the boat re-build. Not happening (at least this year). Plan on spraying with bleach. I also have a steamer that is great at cleaning and disinfecting things. This is waiting on the ice box job.

Jonathan Bressler Forwarded these articles: Epoxy Works and Another one from Atomvoyages

Here is site for tanks that have one that will fit in port cockpit locker. https://ronco-plastics.com/product/water-waste-holding-tank/

Leave a comment

Filed under Interior

All that sand in the bilge!

I got this off the A30 list, and wanted to capture it here for later reference – Thank you David. On Laughing Gull, I have done the aft end, but not he bilge under the batteries. This is next.

==================================

—– Forwarded Message —–
From: David Van Denburgh <denburgh@andrews.edu>
To: Jonathan Adams <laughing_gull@verizon.net>; Chip Dance <chipdance01@gmail.com>; Chip Dance via Public-List <public-list@lists.alberg30.org>
Sent: Wednesday, March 2, 2016 10:53 AM
Subject: Re: [Public-List] 1975 bilge leak
Here is my experience – taken from my blog – about the cement/sand in my bilge and the repair:

In the area just forward of the aftermost floor, there was a piece of exposed ballast and aft of it a cement-like material intended, I suppose, to keep the ballast in place and the fill the aft area of the keel.

Water had apparently leaked through this area for some time because a previous owner installed a drain in the bottom of the keel just aft of this position.  Once I’d vacuumed the junk out of the bilge, I noticed a hole had been drilled down through the cement, and after rodding it out with a screw driver I was able to see through to the drain in the keel.  I’m not too keen on having a exposed fitting mounted to the bottom of the keel where it could be damaged or ripped loose in a grounding, so I will eventually remove it and install a garboard drain even with the bilge bottom.

I mixed up some epoxy and applied a thin coating over the exposed material in the keel as an initial seal.  Once it was tacky, I mixed up epoxy thickened with colloidal silica and used it to fill in some of the larger gaps.  Atop that I laid a layer of fiberglass cloth.  Although that provided some measure of protection to that area, it left an irregularly shaped bilge, so I cut a couple pieces of blue DOW styrofoam board to fit and fill the bottom of the bilge, creating a flat surface that sloped slightly forward from the aft portion of the bilge.  I then covered the area with a layer of 1708 biaxial cloth that attached well up the sides of the bilge, creating new bilge bottom and sealing the area beneath.

http://alberg30project.blogspot.com/2012/07/having-lot-of-other-stuff-to-do-canvas.html

Leave a comment

Filed under Interior, Structural

Ice Box Rebuild on Alberg 30 Pandora #8, and Gilleleje #505

The attached information was provided by Brooke, who is just finishing a total rebuild of Pandora. His approach was based on this article from Wooden Boat magazine 1999 which I found interesting. Also Mike Lehman on a new style boat upgraded his box, and those pictures and comments can be found here. These two presentations were topics on the recent 2/2016 Alberg 30 seminar. Also note that Mike had some research on refrigeration units as he added a refrigeration unit – which works really well with low battery drain.Those articles are here PS June 2009 and here PS October 2013

Leave a comment

Filed under Interior

Ice Box Rebuild

Started on 2/28/16
*****************************
This approach Wooden Boat Ice Box Article
Bill of material Spreadsheet

*****************************
Demo almost complete. Need a new blade for the dremel, and I can get the tabbing off close to the hull.

022816102902281610410228161102022816123902281613260228161327

3/6/16 Demo Complete

The fiberglass is mostly cleaned up. I put a coat of paint on – although just realized that the cleats on the hull side will need to be on bare glass – doh. The bits that are not painted are the bits where I retabbed – the resin was still wet. The bulkheads were not completely tabbed on the inside, so any water running down the hull (from the toe rail) could get to the bottom of the plywood. What I did put a stop to that. Now interestingly when it all gets back together, I will have a hard time tabbing the new bulkhead at the foot of the bunk on the icebox side. I think that the challenge is that the icebox needs to be in before that bulkhead goes in which will make it hard to reach the hull – what to do? what to do? I have some thoughts more to follow. Maybe find a friend with long arms? (small hands though)

By the way I burnt out the Dremel oscillating saw, and got a DeWalt – wow no comparison. The Dewalt has a more powerful motor which is really noticeable.

I only had to use the grinder a bit – what a mess. Fortunately with the oscillating saw, I cut it pretty close. I can hold the saw with the vacuum hose in the same hand which keeps the mess down.

030716 Demo Complete

3/12/16 Finalized Templates and measured for the icebox. I also created the Bill of Material and Order of Operations.

0312161228

The template was easier to do in two pieces – easier to scribe the hull curve that way, and then expanded with a spacer in the middle. Although there was only one kerf width of space. Pretty chuffed with myself 🙂

0312161228a

The inboard end had to be scribed to get the curve, and the forward and aft ends notched to accommodate the tabbing on the hull.

0312161739

The foot of the bunk will be tabbed to the bunk and the hull – which is the way it was when I removed it.

0312161739a

The side on the inboard end will be trimmed down later, as will the foot of the bunk. I am thinking of leaving a lip, and perhaps putting a handle there or a step.

0314161705

The measurements are from the top of the board down to the hull. I will need to remove 2″ from the measurement to put the box 1.5″ above the hull.

As of 5/21/16

At this stage after a little drama, the box is in the boat. It fits perfectly. However, it had to be cut in half in order to fit. This made construction harder. Pics and notes are below.

The above show the Box on the template. It was critical that it remain on the template until everything was fully cured. Epoxy shifts even when it appears dry. My first try had to be disassembled as it shifted and then dried out of true. Note that this does not fit into the boat assembled. The box is cut in half (where the blue clamp is). More on that later. Also note that the bump in the shape (first picture far side) is a mistake. Not sure what happened there. I simply ran a straight line from the two side to smooth it out.

This is what the pieces look like prior to assembly

0514160849a

And this is what they look like after assembly.

0514161006b

Prior to putting in, I put the cleats in to attach the front side, and the trim when I get there.

0514161006a

The seam on the after end was closed up after I put in the zip tie to pull it all together.

05151613320515161332b

This is about as big a box as you can get in there. I have not figured out the drain yet. I may install a small hand pump rather than drill a hole through the bottom. We shall see.

0515161331

In this picture, you can see the fiberglass tape on each side along the seam. I have not done the corners yet, and the two screws with the zip ties to hold it all together while it dried are obviously going to come out. The seam was pretty good except for that aft side, but nothing epoxy and fiberglass will not fit.

This is all 1/4 in ply. It was rather floppy when it went in and I was a bit worried. However, once it was all in a screwed and glued it is very stiff, and seem strong. The top will have 1/2 ply added, and the front will be covered with 1/2 ply. This will reinforce things further.

Next steps are to finish the inside, and then get the foam in.

07/17/16 Update – Just getting these in as a placeholder. I installed the 3″ of foam, and then the interior lining with one layer of fiberglass cloth.

When using the anchor as a weight, the CQR is preferred.

Other thoughts  for refining later

  • The expanding foam is good but messy – very easy to cause a bowing out of the insulation of you are not careful – really only impacts getting the internal skin to sit flat – you can hardly see it otherwise.
  • Leave whole top off, so you can work on the lid and hatch in the comfort of your home / shop rather than upside down on a 100 / 37 degree day.
  • West 610 glue instead of / in addition to the epoxy approach defined in the article.

Next step cutting hole in hatch and building lid.

6 Comments

Filed under Interior, Products